Use este identificador para citar ou linkar para este item: https://biblioteca.cbm.df.gov.br/jspui/handle/123456789/622
Registro completo de metadados
Campo DCValorIdioma
dc.contributor.advisorCarvalho, Gabriel Motta de-
dc.contributor.authorUlhoa, Ricardo Costa-
dc.date2025pt_BR
dc.date.accessioned2026-05-27T20:35:45Z-
dc.date.available2026-05-27T20:35:45Z-
dc.date.issued2025-11-04-
dc.identifier.citationULHOA , Ricardo Costa. Um estudo sobre a gestão dos prazos aplicados nas vistorias técnicas do Corpo de Bombeiros Militar do Distrito Federal. 2025. Trabalho de Conclusão de Curso (Curso de Altos Estudos para Oficiais) - Corpo de Bombeiros Militar do Distrito Federal, Brasília, 2025.pt_BR
dc.identifier.urihttps://biblioteca.cbm.df.gov.br/jspui/handle/123456789/622-
dc.descriptionTrabalho de conclusão de curso — Corpo de Bombeiros Militar do Distrito Federal, Centro de Estudos de Política, Estratégia e Doutrina, Curso de Altos Estudos para Oficiais, 2025.pt_BR
dc.description.abstractEste artigo analisa criticamente a gestão dos prazos aplicados nas vistorias técnicas do Corpo de Bombeiros Militar do Distrito Federal (CBMDF). A pesquisa utilizou metodologia documental e estatística sobre processos abertos em 2024, com base em dados extraídos de edificações notificadas pelo CBMDF. Os resultados demonstram a existência de processos com prazos excessivos, em especial em edificações públicas, sem limitação clara. Tal cenário revela fragilidades na regulação vigente (Lei 2.747/2001, Decreto no 23.154/2002 e IN no 01/2021), reforçando a necessidade de revisão normativa e da criação de um indicador institucional para controle dos prazos processuais. Conclui-se pela urgência na adoção de práticas mais rígidas, como a fixação de prazos máximos e a assinatura de Termo de Ajuste de Conduta (TAC), como referência do modelo adotado pelo Corpo de Bombeiros Militar do Paraná (CBMPR). A pesquisa contribui com propostas normativas e gerenciais alinhadas ao Planejamento Estratégico do CBMDF (2025-2030), promovendo avanços na governança da segurança contra incêndio.pt_BR
dc.description.abstractThis paper critically analyzes the management of deadlines applied to technical inspections by the Federal District Military Fire Department (CBMDF). The research adopted a documentary and statistical methodology, using data from processes opened in 2024, based on inspections of buildings notified by the CBMDF. The results indicate the presence of long-standing open cases, especially in public buildings, with no regulatory limitations. This reveals regulatory gaps (Law No. 2.747/2001, Decree No. 23.154/2002 and IN No. 01/2021), highlighting the need for reform and the creation of an institutional indicator to monitor procedural timeframes. The study recommends the implementation of maximum deadlines and the signing of a Conduct Adjustment Agreement (TAC), inspired by the Paraná Fire Department. The research offers normative and managerial proposals aligned with CBMDF’s Strategic Plan (2025- 2030), contributing to better fire safety governance.en
dc.language.isopt_BRpt_BR
dc.rightsAcesso aberto a texto completo.pt_BR
dc.subjectDistrito Federal. Corpo de Bombeiros Militarpt_BR
dc.subjectVistoriapt_BR
dc.subjectSegurança contra incêndio e pânicopt_BR
dc.subjectTermo de ajuste de condutapt_BR
dc.titleUm estudo sobre a gestão dos prazos aplicados nas vistorias técnicas do Corpo de Bombeiros Militar do Distrito Federalpt_BR
dc.typeArticlept_BR
Aparece nas coleções:CAEO 2025 - Combatente

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
Ricardo Costa Ulhoa.pdfTexto completo748,53 kBAdobe PDFVisualizar/Abrir
SEI_186325496_Autorizacao_1.pdf
  Restricted Access
Termo de autorização65,59 kBAdobe PDFVisualizar/Abrir    Solictar uma cópia


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.