dc.identifier.citationARAUJO, Rodrigo Brandão de. Relação entre o estreitamento do vínculo analista do CBMDF / autor de projeto e o tempo necessário para análise e aprovação de projetos pelo CBMDF. 2022. Artigo científico (Curso de Pós-Graduação em Altos Estudos em Segurança Pública) - Universidade Estadual de Goiás, Goiânia, 2022.pt_BR
dc.identifier.urihttps://biblioteca.cbm.df.gov.br/jspui/handle/123456789/344-
dc.descriptionArtigo científico (Curso de Pós-Graduação em Altos Estudos em Segurança Pública) - Universidade Estadual de Goiás, Goiânia, 2022.pt_BR
dc.description.abstractA Diretoria de Estudos e Análise de Projetos do Corpo de Bombeiros Militar do Distrito Federal é o setorial competente para analisar e aprovar projetos arquitetônicos e projetos de prevenção contra incêndio das edificações e áreas de risco do Distrito Federal. Os projetos protocolados nesta Diretoria devem ser analisados dentro de um prazo legal pré-estabelecido em legislação específica, de forma a evitar atrasos, pois descumprimentos de prazo levam o usuário a fazer reclamações nas mídias sociais e veículos de informação, manchando a imagem da Corporação e causando outros problemas correlacionados. Contudo, a quantidade de analistas de projetos deste setorial é limitada, e a construção civil no Distrito Federal não deixa de crescer. Neste ínterim, esta Diretoria implementou ações estreitando os laços entre analistas de projetos e autores dos mesmos, e o presente estudo teve como questionamento verificar se estas ações implementadas influenciaram no tempo necessário para os analistas analisarem os projetos protocolados. Para tanto, foi utilizado o método dedutivo analítico, através de uma pesquisa qualitativa, utilizando-se de estudo bibliográfico e documental, em que as legislações pertinentes ao tema foram identificadas; posteriormente a dinâmica, o funcionamento da análise e as ações que foram implementadas foram apresentadas, e por fim, os dados estatísticos foram levantados e analisados, levando-se em consideração o período anterior e posterior à implementação das referidas ações.pt_BR
dc.description.abstractThe Directorate of Studies and Project Analysis of the Military Fire Brigade of the Federal District is the competent sector to analyze and approve architectural projects and fire prevention projects for buildings and risk areas in the Federal District. Projects filed with this Board of Directors must be analyzed within a legal deadline pre-established in specific legislation, in order to avoid delays, as non-compliance with the deadline leads users to make complaints in social media and information vehicles, tarnishing the Corporation's image and causing other related problems. However, the number of project analysts in this sector is limited, and civil construction in the Federal District continues to grow. In the meantime, this Board implemented actions strengthening the ties between project analysts and their authors, and the present study aimed to verify whether these implemented actions influenced the time needed for analysts to analyze the projects filed. For that, the analytical deductive method was used, through a qualitative research, using bibliographic and documental study, in which the legislations pertinent to the theme were identified; later, the dynamics, the functioning of the analysis and the actions that were implemented were presented, and finally, the statistical data were collected and analyzed, taking into account the period before and after the implementation of said actions.en
dc.language.isopt_BRpt_BR
dc.rightsAcesso aberto a texto completopt_BR
dc.subjectDistrito Federal. Corpo de Bombeiros Militarpt_BR
dc.subjectDistrito Federal. Corpo de Bombeiros Militar. Diretoria de Estudos e Análise de Projetospt_BR
dc.subjectProjeto de arquiteturapt_BR
dc.subjectPrevenção de incêndiopt_BR
dc.titleRelação entre o estreitamento do vínculo analista do CBMDF / autor de projeto e o tempo necessário para análise e aprovação de projetos pelo CBMDFpt_BR
dc.typeArticlept_BR
Aparece nas coleções:Trabalhos de conclusão de curso aprovados em outras instituições

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
ARTIGO_BRANDAO.pdfTexto Completo466,08 kBAdobe PDFVisualizar/Abrir
cessaao_de_direitos_BRANDAO_ASSINADO.pdf
  Restricted Access
Termo de autorização62,12 kBAdobe PDFVisualizar/Abrir    Solictar uma cópia


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.